MIM is not casting
Auditors sometimes apply sand-casting checklists to MIM — missing feedstock control, sintering curves, and density verification.
Key control points
- Feedstock lot traceability (binder + powder)
- Mold cavity qualification records
- Sintering furnace profiles with thermocouple calibration
- Density > 98% theoretical for 304 stainless
- CPK studies on critical dimensions
Ready to convert your copper part?Upload your STEP drawing — our engineers respond within 24 hours.
Request a QuoteMIM Precision is ISO 9001:2015 certified with 500,000+ parts shipped monthly. Contact engineering for audit pack requests.
Comments
Loading comments...